Welcome to Oakwood Veneer!
We're glad you're here. Call Us to Place an Order or Obtain Information
Oakwood Veneer Company Wood Veneer Products Wood Veneer Prices Wood Veneer Guarantee About Oakwood Veneer Shop Wood Veneer Order Wood Veneer Closeouts Veneers Tips & Advice Wood Veneer Gallery Wood Veneer Links Frequently Asked Questions

Visa, Mastercard, Discover, UPS, FedEx

Parcel Force

Sign up for our Newsletter
Sign up for our Email List

Contact Adhesive Toubleshooting Guide


A vacuum press, hot press or cold press are the preferred methods of veneer installation. The following troubleshooting guide, however, is for those of you applying veneer with contact cement.

Problem Cause Possible Solutions
1. Edge lifting • insufficient adhesive
• combining too soon (trapped solvent)
• insufficient veneer or substrate compression.
• Apply more adhesive to veneer and substrate. (Both should be covered.)
• Increase drying time.
• Increase nip pressure.
 
2. Bubbles in the veneer. • trapped solvent (solvent odor noted)
• edges bonded first
• irregular adhesive coverage
• irregular compression
• ineffective glue
• Increase drying time.
• Apply pressure from center outward.
• Check applicating method and equipment. (Spraying is better than rolling; rolling is better than brushing.)
• Check compression procedures.
• Use glue with more solids.
 
3. Failure with adhesive on both substrates. • insufficient compression
• insufficient adhesive
• adhesive surface contaminated
• wrong substrate
• Increase pressure.
• Go over surface with iron at about 200-225 degrees.
• Keep work area clean.
• MDF is better than industrial particle board. Particle board is better than plywood.
• Don’t apply veneer over laminate.
 
4. Weak or no contact bond. • exceeded contact bond life
• trapped solvent
• moisture contamination of adhesive surface
• Check to see if glue is old or frozen.
• Increase drying time.
• Check spray equipment for water in air line and increase drying temperature during high humidity.
 
5. Adhesive release from one substrate. • contamination of substrate surface
• contact not dry
• Clean substrate thoroughly.
• Increase drying time.
 


More Helpful Veneer Hints:
Applying Veneer with Contact Cement
Applying Veneer Page 2
How to Judge Spray Adhesive Coverage
Veneer Installation Reminders
Contact Cement Troubleshooting
PSA Veneer Application Guide
Iron On Veneer / PVA Glue Method
How Veneer is Cut
Veneer Matching Techniques
Veneer Acclimation
Glossary of Veneer Terms : A - F
Glossary of Veneer Terms : G - L
Glossary of Veneer Terms : M - R
Glossary of Veneer Terms : S - Z


All Veneers Always In Stock!

We want to hear from you! Call Us by Free Phone @ 0800 012 4201

We ship throughout the UK, Ireland and Europe with standard delivery in 5 - 7 days!*

*Depending on customs clearance.
** Delivery by FedEx Great Rates - delivery times and prices may vary.

Information on some of our other veneers:
Alder VeneerBeech VeneerBirch (Red) VeneerBirch (White) VeneerBubinga VeneerButternut VeneerCherry VeneerCypress VeneerDouglas Fir VeneerCarpathian Elm BurrHickory VeneerJatoba VeneerLacewood VeneerMadrone VeneerMakore VeneerMaple VeneerPadauk VeneerPearwood VeneerPurpleheart VeneerRed Oak VeneerSapeli VeneerSycamore VeneerTeak VeneerWalnut VeneerWenge VeneerWhite Oak VeneerZebrano Veneer

Oakwood Veneer Company - An American company serving the UK, Europe and Beyond!
Corporate Address: 1830 Stephenson Highway, Suite A, Troy, MI 48083 USA
UK Mailing Address: Oakwood Veneer Company - Unit 262 P.O. Box 6945 London, W1A 6US

Wood Veneer | Wood Veneer Products | Prices | Guarantee | About Us | Veneer Blog
Shopping Cart | Ordering | Featured Items | Closeouts | Veneer Samples | Veneer Glossary
Veneer Tips | 15 Common Mistakes | Gallery | Contact | FAQ | Useful Links | Directory
Articles on Working with Wood Veneer | Site Map (XML)

Wood Veneering Tips RSS Feed

© Oakwood Veneer Company, 2002-2012 - All Rights Reserved